UW: Element

A funded research initiative and the University of Washington's (UW) campus-wide Lean initiative. It aims to streamline building information access for Facilities Services Leads and Maintenance personnel.

Collaborating with the Capital Projects Office (CPO) and Construction Management (CM) department, I developed and evaluated a GIS-enabled interface designed to reduce time spent on work order management and improve overall operational efficiency. This project was also the basis of my Master's thesis, fulfilling the requirements for a Master of Science in Construction Management.

Key features

I worked with professor Carrie Dossik to come up with key features for this product

1.Single-Click Dispatch

Replaces 100 clicks and 5 screens with immediate mobile push assignment.

2.Spatial Cluster Triage

Reroutes technicians by floor and building to eliminate redundant cross-campus transit.

3.Automated Asset Intelligence

Asset history auto-verifies warranty status without relying on technician memory.

Process 

Generative Research synthesis

Task Analysis System design

Concept generation & Usability Testing

Visual Design

Persona Development

Key challenge‍ ‍

design and evaluate an intuitive, GIS-based interface that could be effectively utilized by this specific user group.

Goal

Efficiency improvement

  • Facilities Services Leads, often possessing limited technical expertise, faced significant challenges in efficiently locating and accessing critical building information.

  • This resulted in prolonged work order management times and hindered their ability to quickly address maintenance issues.

Success measures‍ ‍

Usability testing paper & digital prototypes

My role & Process

Comprehensive Research: Conducted secondary research to understand existing GIS and facilities management systems.

Contextual Inquiry & User Interviews: Directly engaged with Facilities Services Leads through contextual inquiries and in-depth interviews to understand their daily workflows, pain points, and information needs.

Stakeholder Collaboration: Facilitated interviews with CPO and CM stakeholders to gather project requirements and align on design goals.

Persona Development: Created detailed user personas to represent the target audience and guide design decisions.

Information Architecture & Interaction Design: Utilized affinity diagrams, card sorting, and information architecture diagrams to structure information and optimize navigation.

Prototyping & Wireframing: Developed interactive prototypes and wireframes using Axure to visualize and test design concepts.

Usability Testing: Conducted rigorous usability testing sessions with Facilities Services Leads to evaluate interface effectiveness and identify areas for improvement.

Task Analysis and User Matrix

I worked with professor Carrie Dossik to come up with task analysis based on the generative user research

Work Order Process: HVAC / Refrigeration Scenario

Persona creation

Synthesized generative user research into distinct personas representing digital system target users.

Quote Source: Insert Source here

“This is a quote extracted from hours of listening to users and recording interviews with them and analyzing the data.”

- Primary Persona

Quote Source: BRI Risk Investigation Research Report

“When we are able to diagnose the root cause of issues efficiently and take the best course of action it results in a much better customer experience and assures that both buyers and sellers are being protected on the platform”

- Secondary persona

Paper prototyping

Paper prototyping allowed me to quickly ideate and share ideas with end users.

3D Model Simulations

Using a single 3D model campus building for concept experimentation in 3D building system work order simulations.

Digital Experience UX Design

I created Concept designs to use for usability testing with end users.

Visual Design

Design development including visual design development to accurately depict work order urgency and severity.

Impact & Outcomes

Usability testing provided valuable insights into the interface's effectiveness and identified key areas for refinement. The project demonstrated the potential of a GIS-enabled interface to significantly improve the efficiency of Facilities Services Leads by:

1.Reducing the time spent searching for building information.

2.Streamlining work order management processes.

3.Enhancing the ability to quickly assess and address maintenance problems.